![](https://i2.wp.com/thesmokesignal.org/wp-content/uploads/2019/02/pool-for-web.jpg?resize=777%2C437&ssl=1)
Video By Web Editor Rishi Chillara
After almost a year of construction, MSJ’s new pool was completed. If you haven’t had a chance to check it out, watch the Smoke Signal’s drone flyover of the new facility.
The Smoke Signal, MSJ's Official Newspaper
Video By Web Editor Rishi Chillara
After almost a year of construction, MSJ’s new pool was completed. If you haven’t had a chance to check it out, watch the Smoke Signal’s drone flyover of the new facility.